Barzan pipeline project

Provision of air diving spread services on-board CASTORO II moored pipe laying barge.

Customer: Qatargas Operating Company Limited
Contractor:
Saipem S.p.A
Location:
Barzan gas project, North Field, Persian Gulf, Qatar
Start date:
20 September 2019
End date:
20 February 2020

Barzan 2019 image 2

The solution

The James Fisher Subtech team successfully provided the following services:

  • 4.5” piggy back MEG line repair
  • Riser guard removal and installation
  • Boat landing removal and installation
  • Riser stalk-on installation – clamp installation
  • Strong back installation – clamp installation
  • 4.5/ 3.5’ MEG Line demolition
  • Anode removal and demolition
  • Anode installation